smart
wastewater
treatment
solutions
Aussie-made, for Aussie homes
Aussie Treat was born from the demand of the industry. Our clients were after a robust, well built concrete system with a large treatment capacity to suit an Australian household.
They also wanted to be able to speak to the people who own the business and offer answers directly to any questions or concerns. In 2022 Jay Surman and Jarrod Bissett joined forces to make this possible.
The system
The Aussie Treat Model 20 is an Advanced Secondary Wastewater Treatment system which has been designed and tested to treat black water and grey water producing clean clear water for irrigation on grass and landscaped areas.
Tank features
Monolithically precast 40Mpa concrete tank and lid
4 manhole covers and 1 inspection opening for service access
Full height solid concrete internal walls
Flow control system to reduce effect of large inflow
2000L p/day capacity approved to latest Australian standards
4 x 2.5t clutch lifting system
575mm invert below ground level (deeper available with risers)
Australian designed and built electrical system
Tank specifications
| Diameter | 2.5m |
| Height | 2.325m |
| Weight | 7.3t |
| Air blower | 100L/min |
| Irrigation pump | 9m or 32m head |
Treatment process
Primary 1 Chamber
Wastewater first enters the primary 1 chamber which acts as an old-fashioned septic tank. The organic and inorganic solids settle to the bottom, while fats and other floating matter forms a scum layer on top of the liquid in the chamber.
Anaerobic bacteria feed off the sludge layer and break down some of the organic matter.
Primary 2 Chamber
Fluid flows through two baffles into the primary 2 chamber. A second primary chamber is a huge advantage as it lengthens and slows the flow, allowing the material passing to be a lot cleaner.
The Aussie Treat method is different—utilising a flow controller in this chamber driven by an air venturi system.
The benefit of this is that the flow controller trickle feeds the partly treated water into the aeration chamber to be treated at an efficient speed. By doing so the primary 2 chamber lowers the liquid level well below the outlet height to take out any surge or shock loads from morning showers and loads of washing.
Aeration
In this chamber, air is introduced through disc diffusers to circulate the fine remaining suspended material and provide oxygen for aerobic bacteria to thrive on.
Aerobic bacteria are very aggressive and provide the main treatment component of the system. A large amount of media is also installed in this chamber to house the aerobic bacteria while it does its job.
Clarification
The 4th chamber is a clarification chamber which slows the flow and allows suspended particles to settle.
An air driven sludge return is set up to feed any of the settled material back to primary 2. A skimmer is also installed in this chamber to take any remaining floating material back to the start of the aeration chamber. As the solution leaves this chamber it passes through a filter basket.
Pumpwell
Treated waste water then travels through a baffle where it is disinfected and pumped out to the designed irrigation area.
Installation
Installation of your system is to be completed by a licensed plumber or one of our distributors.
Each system is transported to site on a crane truck and craned into position (where possible) using specialised lifting equipment. Each truck has a fully remote controlled crane system allowing the driver to maintain a safe operating procedure while positioning and unloading. Unloading of the concrete tanks are made from the rear of the vehicle which backs up to the corner of your prepared site.
Council submission
For submission to council you will require a treatment plant approval number, model number and system capacity.
Model no. Aussie Treat Model 20
TPA no. 09/2022
Capacity 7,000L or 2,000L/day
Site preparation dos and don’ts
To ensure the longevity and warranty of our concrete tanks please follow site preparation sheets
Ongoing maintenance
To ensure top quality and performance of your new system, it is recommended that you conduct maintenance on a regular basis.
We work closely with many distributors, installers and service technicians across Queensland. Please contact us and we can put you in contact with the right person.
The team
Jay
Jay is a qualified Fitter/Turner with over 20 years of experience in the Wastewater industry. Jay has been instrumental in the design, fabrication, testing and streamlining of manufacturing processes over his career.
As a wastewater technician servicing hundreds of systems he has been able to put together a high performing system to deal with the elements.
Jarrod
For the last 15 years Jarrod has been the proud owner of a concrete precast yard specialising in manufacturing, and installation of precast concrete tanks for water storage, wastewater treatment, and stormwater management.
As a qualified Civil Engineer Jarrod has been able to refine product quality, product performance and moulding techniques to make the monolithically poured concrete Aussie Treat a possibility.
Quality wastewater treatment systems
Aussie-made, for aussie homes
Get in touch
Call us
Jay Surman
Jarrod Bissett
Visit us
By appointment only
View our systems and chat to the team at our manufacturing facility in Woombye, or at our storage facility in Chevallum on the Sunshine Coast.
Licensed installers
If you're a current licensed HSTP installer looking for a better system, and better service, get in touch today.